TTM Brings the New TS3030 Counter-Flow Hot-Recycling Asphalt Mixing Plant to bauma CHINA 2026
Exhibition:bauma CHINA 2026
Venue:Shanghai New International Expo Centre, Shanghai, China
Date:November 24–27, 2026
Booth:Outdoor Area F.31
Exhibit:Counter-flow TS3030 integrated hot-recycling asphalt mixing plant
Te1:0086-595-22688000
Te2:0086-595-22091687
Fax:0086-595-22099966
Web:http://www.fjttm.comE-mail:tietuo@fjttm.com
marketing@fjttm.com
bauma CHINA opens at the Shanghai New International Expo Centre on 24 November and runs through 27 November. It is the bauma network's Shanghai edition that provides one the biggest platforms in Asia for construction machinery, building material machines, mining machines and construction vehicles. This year, more than 4,000 exhibitors are expected from over 30 countries, spread across 400,000 square metres. For the customers, it'll mean just one visit, one badge, and a great opportunity to compare competing machines side by side.
This year TTM is in the Outdoor Area F.31. The machinery is already at the venue, and the installation crew is on site performing work according to the list of tasks. If you are nearby on the outdoor area in the days to come and have the opportunity to look in the direction of TTM, you will see that the plant is going up literally piece by piece. There will be no fake showroom furniture there, just the real thing.

We bring the new counter-flow integrated hot-recycling asphalt mixing plant (TS3030) with virgin aggregate and reclaimed material running as one coordinated process rather than being two bolted systems. RAP share can change across a wide band, and at the top end the plant can produce a full reclaimed mix. The centre is a 5.5-tonne mixer with a sealing design that keeps the batch within the mixer while the wear parts last for longer, and mixing stays even, batch after batch.
Each dryer works separately; Φ2500×10000 is for virgin aggregate, Φ3000×12000 is for reclaimed material. The RAP weighing system maintains its setpoint and keeps temperature stable, and material leaves the drum without sticking or wall build-up that could waste an entire shift. The hot bins are sorted according to size, and discharge opens on command so the mix can maintain its grade even when RAP runs high. The finished silo with a 30 m³ volume is incorporated in the same compact frame, which saves yard space. A 1,280 m² bag filter, driven by a 220 kW fan, treats the exhaust, backed by a centralised dust collection setup. If there is a shortage locally, the burner can be used with coal, oil or gas. The unit comes with a TWB15 warm-mix system.
Reason to counter-flow: In fact, there is no direct contact between reclaimed asphalt and the flame. The loss of bitumen's binding power is slowed down as well as the aging of bitumen. In practice, the higher percentage of reclaimed pavement material is possible before the binder starts to lose its strength. As such pavement is being returned to the new road instead of being stacked up at the yard.
If you want to take a look at this new asphalt mixing plant, please come and talk to us at the show. Our engineers will be available in Booth F.31 for all four days, with layout drawings, configuration options and overseas reference cases. Do share your capacity target, fuel situation, and site constraints; our engineers will assist you right there and discuss them on paper without making you commit to anything.
bauma CHINA 2026, here we come. See you in Shanghai.





